1. Service: Life time for brick machine, brick dryer&brick kiln, brick plant technological design.
2. Brick plant design&build, installation and operation
3. Solid brick/ Hollow block
Brick machine factory with brick dryer, clay brick production line
At present, our company undertake various engineering projects including Larger and medium-size baked brick production line and turn-key projects. We Have successively built clay brick production line in India, Bangladesh, South Africa, etc.
Brick machine factory with brick dryer, Brick production line
The brick plant including brick machine for shaping, brick dryer(small tunnel Dryer) for drying and brick kiln (hoffman kiln&tunnel kiln)for firing.
No. Capacity base on size
1 Land
2 Workshop
3 Electricity
4 Brick making machinery (USD)
5 Brick making machinery capacity
6 How to dry bricks
7 Tunnel dryer
8 Equipment cost of dryer (USD)
9 Production days in a year (can't produce in rainy season)
10 Kiln type
11 Equipments of Hoffmann kiln
12 Building materials for foundation, kiln and dryer construction (bricks, cement, sand)
13 Man power for the project construction
14 How long to build the plant
15 Man power for operate the plant
16 Working system
Total investment as per our experience (USD) (include foundation, civil work, shed, building materials, labor cost)
Our company provide the clay brick making machine\soil brick making Machine\mud brick making machine\solid brick making machine\hollow brick Making machine\hollow block making machine fired brick making Machine\baked brick making machine\red brick making machine, etc, brick Plant design, brick plant building, brick dryer design and building, brick kiln Design and building, turn-key project. Equipment installationg and personnel Training.
Brick machine factory with brick dryer, clay brick production line
small Tunnel dryer |
capacity |
Equipment cost of drye |
Production days in a year |
6 tunnels |
15~20 million pcs annual |
dryer cart, hydraulic ferry pusher, blwer, Three wheel cart, etc |
330 days |
8tunnels |
20~25 million pcs annual |
dryer cart, hydraulic ferry pusher, blwer, Three wheel cart, etc |
330 days |
10 tunnels |
25~30 million pcs annual |
dryer cart, hydraulic ferry pusher, blwer, Three wheel cart, etc |
330 days |
12 tunnels |
30~35 million pcs annual |
dryer cart, hydraulic ferry pusher, blwer, Three wheel cart, etc |
330 days |
14 tunnels |
35~40 million pcs annual |
dryer cart, hydraulic ferry pusher, blwer, Three wheel cart, etc |
330 days |
16tunnels |
40~45 million pcs annual |
dryer cart, hydraulic ferry pusher, blwer, Three wheel cart, etc |
330 days |