No. | Capacity base on size | 50,000pcs per day |
1 | Land(m2) | 15,000~20,000 |
2 | shed for machinery (m2) | 200~500 |
3 | shed for dryer (m2) | 800~1200 |
4 | shed for tunnel kiln (m2) | 800~1200 |
5 | Electricity | 400~700kw |
6 | raw material(m3day) | 145~160 |
7 | coal fuel(ton/day) | 5.1~5.8 |
8 | Electricity (kwh/day) | 2,150~3,100 |
9 | Brick making machinery (USD) | 144,000~204,000 |
10 | Extruder | VP45 7000pcs/hour (one shift) |
11 | Artifical drying | samll tunnels dryer |
12 | Tunnels quantity | 6 tunnels |
13 | Equipment of dryer (USD) | 250,000~300,000 |
14 | Production days in a year (can produce in rainy season) | 330 days |
15 | Kiln type | Tunnel kiln (2.5 meters width) |
16 | Equipments of Tunnel kiln | 400,000~600,000 |
17 | Building materials for foundation and kiln construction (bricks,cement,sand) | solid bricks:1.2 million pcs cement:30~35 tons sand:120m³ approx: 500ton refractory bricks |
18 | Construction period | 3~4 months |
19 | Man power for operate the plant | 30~60 |
20 | Firing period | 24 hours firing |
21 | Total cost for equipments | 794,000~1,104,000 USD |